PREVIEW BUILD β staging only, not live. Reads real job; all check-offs/clock-ins are locked until approved.
Project Board
Nicole Ginoza Residence
Kapolei, HI Β· Interior & Exterior Renovation
π Directions to site
Job progressPhase 3β4 of 10 Β· 2 crews on site
π Crew mode on Β·
lock
Not clocked in
π Location checked at clock-in
Capture
Photos & videos go into today's Daily Log Β· take new or pick from your phone.
π΄ Recording daily logβ¦
0:00
Writing your daily logβ¦
about 30 seconds
Your daily log β review & approve
π· Today's photos attach automatically Β· edit the words above if anything's off
Scope β Start to Finish
DoneIn progressUp next
β
1 Β· Pre-Con & Site ProtectionWalkthrough, protection, dust control
Done
βΆ
β
2 Β· Demo & RemovalTear-out, haul, prep
Done
βΆ
3
3 Β· Rough-In & StructuralFraming, hurricane ties, MEP
In progress
βΆ
β
Exterior carpentry repairExterior
β
Hurricane tie-downs β atticAttic
β
Bedroom wall framingBedrooms
β
Electrical & plumbing rough-inKitchen
4
4 Β· Insulation & DrywallInsulate, hang, tape, mud
In progress
βΆ
β
Attic insulation β R-30Attic
β
Drywall hang β bedroomsBedrooms
β
Tape, mud & sandBedrooms
5
5 Β· Paint & FinishesPrime, paint
Up next
βΆβ
Prime & paint bedroomsBedroomsβ
Kitchen wall prep & paintKitchen
6
6 Β· Flooring & TileUnderlayment, install, grout
Up next
βΆβ
LVT flooring installBedrooms
7
7 Β· Trim, Doors & CabinetsBase, casing, doors
Up next
βΆβ
Baseboard & quarter-roundBedrooms
8
8 Β· Fixtures & Final MEPOutlets, lights, trim-out
Up next
βΆβ
Fixture trim-outKitchen
9
9 Β· Clean & Punch ListFinal clean, touch-ups
Up next
βΆβ
Final clean & punchWhole home
10
10 Β· Final Walkthrough & Sign-OffClient walkthrough
Up next
βΆβ
Client sign-offWhole home
A
AtticInsulation & hurricane ties crew
Active
βΆ
β
Attic inspection sign-off
B
BedroomsFraming β drywall β paint crew
Active
βΆ
β
Drywall hang, tape & mud
β
Flooring, trim & doors
K
KitchenWall repair, paint, fixtures
Up next
βΆ
β
ExteriorCarpentry repair
Done
βΆ
β
Carpentry repair & replace